by Dave Mann | Jun 19, 2016 | News, Uncategorized
Our latest installation at the fabulous Ardtornish Estate in Morven, Scotland required delivery along some single track roads through stunning mountain scenery. This installation is their third hydropower system and will provide a unique visitor attraction as well as...
by Dave Mann | May 1, 2016 | News
The first scheme to use 3 screws in parallel generating 430kW has started construction on the River Thames near Oxford. Commissioning is expected in September 2016. Recent Posts Mannpower Hydro Ltd. is now part of the TLS Energy Group Highland Delivery Investment...
by Dave Mann | Apr 29, 2016 | News
A 320kW twin screw project was successfully commissioned in the centre of Totnes in Dec 2015, and is now generating 15% more power than expected. The system is on the very last weir on the river Dart (that already has two other operating Archimedean screw systems...
by Dave Mann | Apr 28, 2016 | News
The first screw system we designed and installed in Scotland, located near Strathdon in the Cairngorms National Park has now been operating for almost 10 years. Average output over this period has been just over 12% higher than we predicted, thus proving what a good...
by Dave Mann | Oct 28, 2015 | News
An ultra low head scheme operating on only 1.5m head and producing 100kW from twin screws was commissioned near Inverness ahead of schedule and is now delivering power to the local farm. The river level upstream varies throughout the day by up to 700mm because of...